Building your dream home in Nigeria is an exciting but financially demanding journey. With the constant volatility in the market—driven by foreign exchange rates, inflation, and logistics—accurate budgeting is the single most crucial step to prevent project stalls and cost overruns.
This guide provides a comprehensive breakdown of the three core cost components—Materials, Labour, and Soft Costs—with realistic price ranges for the 2024/2025 construction period.1. The Golden Metric: Cost Per Square Meter (CPM)
Before diving into unit prices, start with a quick, high-level estimate using the Cost Per Square Meter (CPM). This helps you determine if your project size aligns with your budget.
| Project Finish/Quality | Estimated CPM Range (₦/sqm) | Total Project Cost (Example: 200 sqm house) |
| Basic Finish (Standard materials, simple design) | ₦180,000 – ₦250,000 | ₦36 Million – ₦50 Million |
| Good/Average Finish (Quality materials, modern design) | ₦250,000 – ₦350,000 | ₦50 Million – ₦70 Million |
| High-End/Luxury Finish (Imported fittings, complex structure) | ₦350,000 and above | ₦70 Million+ |
These estimates cover the entire construction from foundation to final finishes (excluding land cost). Location (Lagos, Abuja vs. smaller cities) can cause a variance of up to 30% because of logistics and labour rates.
2. Component 1: Material Costs (The Hard Costs)
Material costs typically account for 55% to 65% of the total construction budget. Prices are highly fluid, so use these ranges as a powerful guide, but always confirm with current market quotes before making a purchase.
| Material Item | Unit | Estimated Price Range (₦) | Key Notes |
| Cement (50kg Bag) | Bag | ₦6,500 – ₦8,500 | Varies heavily by brand and state. Prices tend to be highest in major cities. |
| 9-Inch Block (Sandcrete) | Piece | ₦300 – ₦650 | Price for vibrated/stone dust blocks is usually higher than hand-moulded blocks. |
| Sharp Sand (20-Ton Trip) | Trip | ₦60,000 – ₦120,000 | Essential for concrete and plastering. Varies significantly by proximity to the source. |
| Granite/Chippings (20-Ton Trip) | Trip | ₦180,000 – ₦250,000 | The primary aggregate for concrete. |
| Reinforcement Steel Rods (1 Ton) | Ton | ₦450,000 – ₦550,000 | Price is highly sensitive to the Naira's exchange rate. |
| Roofing Sheet (0.55mm Aluminium) | Sq. Meter | ₦4,000 – ₦6,000 | Price depends on gauge, profile, and brand (e.g., long span vs. step tile). |
| Floor Tiles (Standard 60x60 Vitrified) | Sq. Meter | ₦4,500 – ₦8,000 | Local/China tiles are at the low end; Italian/Spanish are at the high end. |
3. Component 2: Labour Costs (The Workmanship)
Labour costs account for approximately 20% to 30% of the total budget. You will encounter two main pay structures: Day Rate and Contract Rate (payment per unit of work).A. Daily Rates (For General/Unskilled Work)
| Category | Daily Rate Range (₦) | Notes |
| General Labourer (Unskilled) | ₦2,500 – ₦6,000 | Used for carrying materials, mixing, and general site cleaning. |
| Skilled Artisan (Mason, Plumber, Electrician) | ₦7,000 – ₦15,000+ | Highly skilled workers are often contracted for the entire job, not just daily. |
B. Contract Rates (Payment per Task)
For major stages, contractors typically charge a per-unit or fixed fee for the entire job.| Construction Stage | Contract Rate/Unit (Example) | Estimated Range (₦) |
| Block Laying | Per Block | ₦100 – ₦250 |
| Plastering | Per Square Meter | ₦1,200 – ₦2,500 |
| Roof Carpentry/Installation | Total Project (Fixed Fee) | ₦300,000 – ₦5 Million+ |
| M&E (Plumbing/Electrical) | Per Point/Total Contract | ₦1.5 Million – ₦5 Million |
4. Component 3: Soft Costs (The Hidden Expenses)
These non-physical costs are often overlooked but are mandatory. They typically account for 10% to 20% of your initial budget.| Expense Category | Estimated Range (₦) | Description |
| Architectural & Design Fees | ₦200,000 – ₦2,000,000 | The cost of hiring an architect to produce the detailed building plans. Varies based on project scale and designer reputation. |
| Structural/M&E Engineering Drawings | ₦150,000 – ₦800,000 | Fees for engineers to certify the stability, plumbing, and electrical plans. |
| Surveying & Soil Test | ₦100,000 – ₦550,000 | Mandatory cost for land survey (boundaries) and soil test (foundation design). |
| Building Permits & Approval | ₦50,000 – ₦3,000,000 | Fees paid to state/local government authorities. Varies dramatically by state, project size, and land value. |
| Legal Fees | ₦100,000 – ₦500,000 | For drafting contract agreements (for contractors) and processing title/permit documents. |
| Site Supervision/Project Management | 5% – 15% of Total Project Cost | The fee for a professional (Quantity Surveyor or Project Manager) to oversee the work and manage quality/budget. |
Final Action Plan: The Contingency Rule
Given the unpredictability of the Nigerian economy, no estimate is complete without a financial buffer.
- Calculate Your Total Expected Cost (TEC): Add up all Hard Costs, Labour Costs, and Soft Costs.
- Add a Contingency Fund: Allocate an extra 20% to 30% of your TEC for unforeseen expenses (e.g., unexpected material price hikes, foundation issues, or approval delays).
By calculating your budget with these structured components and including a generous contingency, you position yourself to complete your construction project smoothly and on schedule.