Skip to main content

Cost Of Building A 3 Bedroom Bungalow In Nigeria

Cost Of Building A Simple 3 Bedroom Flat
Cost of Constructing a Simple 3 Bedroom Bungalow


Have you been around people discussing building a house? The amount of money they mention can be scary sometimes. You hear that they constructed a simple three-bedroom flat in the village with ₦10 million. Some say you need ₦25 million to build a 3-bedroom house with moderate finishing. And these amounts do not include the cost of acquiring land or furnishing.

Then, you begin to wonder: if it costs ₦25 million to construct a modest three-bedroom bungalow in the village, how much will it cost to build the same in a city like Lagos? But I know some bike riders, mechanics, carpenters and traders in Lagos who presently live in their houses. How did they do it? Did they spend up to ₦10 million on construction?…

Of course, you can spend ₦25 million or even ₦1 billion to construct a three-bedroom bungalow if you want. But it is also very possible to spend less. Yes, as little/much as ₦5.5 million! And this article will show you how.

Follow as we go through the various stages of building a 3-bedroom bungalow, from general requirements such as acquiring land, getting your architectural drawings and getting government approval to the building stage proper.

This article may not give you the exact amount it will cost you to build your own house, but it provides a stage-by-stage analysis of the process of constructing a standard 3-bedroom flat along with cost estimates.

Acquire a Good Land

The price of land depends on its location and the prevailing real estate market conditions. Take the example of Lagos State. Land may cost ₦400,000 at Badagry, ₦120 million at Ikeja, and ₦650 million on the Island.

Buying full land is a good idea, but you can further reduce cost by going for half plot of land. A half-plot of 30ft x 120ft or 60ft x 60ft or 50ft x 50ft or 25ft x 100ft can take a 3-bedroom flat with enough space for parking two cars. See more building ideas that can fit on a half-plot land.

It is better to buy land with a Certificate of Occupancy (C of O) and other relevant documents to avoid falling for scammers. The land documents you need to collect from the seller include:

  • Survey Plan
  • Gazette
  • Deed of Assignment
  • Certificate of Occupancy
If you purchase land from Baba/Chief with no registered survey plan, quickly get one for yourself. The cost of getting a registered-survey plan is between ₦350,000 and 1,000,000 on the mainland. For example, a survey plan for land in Ikorodu, Badagry Ojo, Epe and Ajeromi Ifelodun L.G.A.s cost ₦350,000. But for lands in Somolu, Mushin, Alimoso, Agege, Kosofe, Ibeju Lekki, Amuwo Odofin, Lagos Mainland, it costs ₦650,000.

Let the cost of land be ₦400,000, and the cost of the survey plan be ₦350,000.

The total cost of acquiring land = ₦750,000

Get Your House Plan

Do not be tempted to draw your plan by yourself because your drawing might not meet the government requirements for approval. Also, remember that this is going to be your home. A poorly-designed plan can lead to faulty construction that will make life in the house uncomfortable.

It is advisable to get your plan from professionals, and it does not cost much. It costs between ₦50,000 and ₦300,000 to get a building plan for a bungalow depending on the location, the professionals, etc.

A building plan comprises of several different drawings that show various aspects of the building process, and it usually includes the following:

  • Architectural drawing,
  • Structural drawing,
  • Electrical drawing,
  • Mechanical drawing, etc.

When you have your building plan, you will submit it to the government for approval. The government will charge you some money for this, and it is usually around ₦50,000 - ₦300,000 for a 3-bedroom bungalow in Lagos state. Once you get building plan approval in Lagos, you are ready to start building your home. Also, ensure you get a Bill of Quantities (BoQ) as that is the only way you can be sure of the exact material requirements for your project.

The cost of the building plan and government approval = ₦300,000.

Prepare Your Land For Construction

This stage is when activities needed to prepare the land for construction come in. Such activities include clearing the land, uprooting unwanted trees, and creating access to your land for vehicles delivering building materials.

It is easy to find workers to hire for this stage, and it usually costs between ₦20,000 and ₦50,000 depending on the size of the land, the nature of the soil, location, the number of trees to be uprooted, many other factors.

The cost estimate for preparation stage = ₦50,000.

Building Stage

For this part, we will be using building material requirements compiled from an actual construction project. Let us divide the building process into four major stages, namely,

  1. Foundation to the Damp Proof Course (DPC, also called German floor) and Soak-away
  2. DPC to lintel level
  3. Roofing
  4. Finishing

Stage 1: Foundation to DPC (German floor), Well and Soak-away

This stage usually involves setting-out, digging, concrete work, laying foundation block, filling, and flooring. Let us calculate the cost of each phase.

  • Material Requirements for Setting-out with profiles
4 pieces of 1x12 plank @ ₦1,200 each plus ₦800 (for dividing each into 5 (@ ₦200 each) = ₦5,600
4 bundles of Pegs @ ₦1,200 each = ₦4,800
2" and 3' Nails = ₦1,200 worth of nails
4 bundles of rope @ ₦200 each = ₦800
Labour = ₦4,000

>>>Approximate cost of setting-out = ₦15,200

  • Material Requirements for Digging/Excavation
Either you or the labourers will rent some diggers and shovels for the job. These tools can cost about ₦2,000 to rent.
Labour = ₦4,000

>>>Approximate cost of digging = ₦6,000

  • Material Requirement for Concrete work/Blinding
For a standard foundation of 150 mm base-thickness, assuming 0.45 m (breadth or height) and 85.5 m (length of entire building) = 5.77125 m3. We need

10 bags of cement @ ₦2,600 each = ₦26,000
20 tonnes of sand x 2 = ₦80,000
20 tonnes of Granite = ₦100,000
We do not need a reinforced bar (Rebar) because the soil is good, firm and dry.
Litres of water as needed.
Labour = ₦18,000

>>> Approximate cost of concrete work = ₦224,000

  • Material Requirements for Laying Foundation Blocks
We are using 9" blocks and laying 4 coaches. Materials needed are12 bags of cement @ ₦2,600 each = ₦31,200
644 pieces of 9" vibrated blocks (including 10 percent wastage) @ ₦170 each = ₦109,480
Plumbing work = ₦25,000
The remaining sand from concrete work serves here.
Labour = ₦32,200

>>>Approximate cost of laying foundation blocks = ₦197,880

  • Material Requirement for Filling
I suggest digging the soak-away and septic tank alongside making the foundation. That is so that the soil dug-up from the soak-away pit, septic tank and well can serve as foundation filling. Doing so will save you the cost of buying some trips of sand for foundation filling. It also saves you the cost of clearing the dug-up soil in a case where you're not using it for filling. If you follow the suggestion above, you may need to buy only a few trips of sand in case the soil dug-up from the well and septic tank is not enough. So,

3 trips of 20 tonnes laterite (fairly clayey) at ₦18,000 = ₦54,000
Labour = ₦10,000

To allow the foundation filling to compact naturally, water it for some hours and leave it for days (or some weeks) before flooring.

>>>Approximate cost of filling foundation = ₦64,000

  • Material Requirement for Foundation Casting/Flooring
25 bags of cement @ ₦2,600 = ₦65,000
Waterproof/nylon = ₦15,000
The remaining granite and sand from concrete work served here.
Labour = ₦18,000

>>>Approximate cost of flooring = ₦98,000

  • Material Requirements for Septic Tank, Soak-away pit and Well
Construct the septic tank, soak-away pit, and well first to have water for the work and sand for filling the foundation later.700 pieces of 6" vibrated blocks @ ₦150/block (for a septic tank of 3m x 3m x 3m) = ₦105,000.
22 bags of cement @ ₦2,600 = ₦57,200 (including plastering).
Number of well-rings as required.
Sand and granite from concrete work served here.
Labour for septic tank, soak-away pit and well = ₦80,000

>>>Approximate cost of constructing both the septic tank, soak-away and well = ₦242,200.

Total cost for stage 1 = ₦847,080 (excluding the cost of well-rings)

Stage 2: DPC to Lintel Level

This stage starts from the German floor to the level before roofing. It covers the main block work, including wall partitions for the various rooms. Again, ensure you get a Bill of Quantities for your building plan as that is the only way to know the exact material requirements for your house.

  • Material Requirement and Labour for blockwork
2100pcs of 6” stone dust vibrated blocks @ ₦150 = ₦315,000.
(The price will increase if you use 9” blocks)
15 tonnes of sharp sand = ₦40,000
30 bags of cement @ ₦2,600 = ₦78,000
Labour = ₦105,000

 >>>Approximate cost of block work = ₦538,000.
(This includes the two coaches of blocks after lintel)

  • Material Requirement for Lintel Casting
20 length of 12mm rod @ ₦2,100/length = ₦42,000
10 length of stirrups @ ₦500/length = ₦5,000
35 length of 1x12x18 wood @ ₦1,700/length = ₦59,500
Nails plus wire for binding = ₦13,000
8 bags of cement @ ₦2,600 = ₦20,800
The remaining sand was used here.
The remaining granite from concrete work served here too.
Labour plus carpenter = ₦30,000 

 >>>Approximate cost of the lintel level = ₦165,300

The total cost for stage 2 = ₦703,300.

Stage 3: Roofing

The cost of roofing varies based on the type of roofing materials you choose to use. So, the price below is for this project. Endeavour to get the BoQ for your house plan and design.

  • Material Requirements for Roofing
320 length of 2x3x12 wood @ ₦450 = ₦144,000
45 length of 2x6x12 @ ₦840 = ₦38,250
25 length of 1x12x12 wood @ ₦1,400 = ₦35,000
1/2 bag of 2" nails @ ₦5,800 = ₦2,900
11/2 bags of 3" nails @ ₦6,000 =₦9,000
1/2 bag of 4" nails @ ₦6,500 = ₦3,250
Aluminium (0.45mm thick) roofing, transportation and Labour = ₦685,900

The total cost for stage 3 = ₦918,300

Note: You can reduce your roofing cost by at least 20% by using the more modern and classy skillion roof (also called the shed roof). See the roof examples here.

Stage 4: Finishing

The final stage covers plastering, wiring, plumbing, fixing windows and doors, tiling, painting, and so on. The cost here varies according to your taste. Below is an estimate for a very modest finishing.
  • Material Requirements for Electrical works
Wires, Pipes, Conduit Boxes, and other necessary materials = ₦360,300
  • Material Requirements for Mechanical and Plumbing Works
Kitchen sink, Pipes, WC, Washing Hand Basin, Overhead Tank, Shower, and other necessary materials = ₦490,200
  • Material Requirements for Ceiling
Woods for nogging, P.O.P Sheets, External wood finishing, PVC Boards, Tank nails, and other necessary materials plus labour = ₦450,000
  • Material Requirements for Windows and Doors
Windows, doors, burglary proof, and fixtures plus labour = ₦500,000
  • Material Requirements for Wall Rendering and Painting
Plastering and painting plus labour = ₦500,000
  • Material Requirements for Floor Finishes
Tiles and others plus labour = ₦250,000

Total cost for stage 4 = ₦2,550,500

Now we add the prices from each section to get the total cost.

Grand Total = Building Plan + Land Preparation + Stage 1 + Stage 2 + Stage 3 + Stage 4

                            = ₦300,000 + ₦50,000 + ₦847,080 + ₦703,300 + ₦918,300 + ₦2,550,500

Grand Total = ₦5,369,100

There you go! Once you get land, you can build and move into your 3-bedroom flat with less than ₦5,500,000!!!

With adequate supervision and expert labour price negotiation, you are sure to save at least 10 per cent cost from each section. Check out these tips for reducing the cost of building your home.

Remember that the above cost is for this project. All the quantities of materials mentioned include a margin for wastage. Meaning you can reduce the cost by reducing waste and using alternative building materials. But never cut corners or hire bad labourers in a bid to cut down on cost. You'll only end up spending more.
In case I missed anything, do let me know your thoughts in the comments section below.

Comments

  1. Thanks so much for this estimation. Can you please do an update as regards the present cost of materials? Thanks

    ReplyDelete
    Replies
    1. Hi Sola,

      I'm glad you found the write-up helpful. I have updated the article with current information. I also included some items I skipped initially.

      Cheers.

      Delete
    2. Pleas can you share your contact details, i have a piece of land around mowe yet to be develop, i will like to work with you in the development and building of this land.

      Delete
    3. Hi,

      You can send your inquiries to castleshub@gmail.com

      I'll assist you in whatever way I can.

      Delete
  2. It's nice to know house's cost in other countries. I think this bungalow is very similar here in the Philippines. Really, house planning is a hard task but satisfying in the end. For more about house planning considerations, you may want to check out this article.

    ReplyDelete
  3. This comment has been removed by the author.

    ReplyDelete
  4. Well analyzed but unrealistic costs . Sorry

    ReplyDelete
    Replies
    1. It will be great if you can point out the sections with "unrealistic costs" and then give us the real costs so that we can all benefit. Thanks in advance.

      Delete
    2. It's realistic, as she said with proper supervision.

      Delete
  5. The 3 bedroom 4 flats had costs me lots more than expected with the involvement of QS, Engr and Architech. From foundation to DPC level , DPC to lintel and 2 coaches after lintel . Until now , Engr has refused to introduce piping and soakaway . I have do not know why even when I told him I need conduit and not surface.

    ReplyDelete
    Replies
    1. Sorry you're having a bad experience with your building project. A quantity survey is simply a list of everything you need to bring the structure on your building plan to live. You're not supposed to spend a Kobo more than what the quantity survey estimated, except you change your building design.
      Hope you got a better Engineer to work with.

      Delete
    2. Please can i get your phone number drop it please

      Delete
    3. Please can i get your phone number drop it please

      Delete
    4. I'm a qualified Architect, I can help you correct all the errors .call me 070333621

      Delete
    5. I'm an architect I can help with a well detailed Architectural drawing,
      Structural drawing,Electrical drawing,Mechanical drawings here is my number 08058596979

      Delete
    6. Good day, I want to put up a bungalow on my land at Awoyaya Ibeju Lekki LGA, Lagos state. I approached an architect to assist with building plan approval and he told me all I needed for a bungalow is just Architectural drawing, that no need for Structural , Mechanical and Electrical to obtain the approval. Please assist to confirm how true this is? Secondly, must I obtain a Certificate of occupancy before I can start building? Cos the title document I currently posses are just survey(not registered), Deed of Assignment and receipt from d family. Please, kindly enlighten me on the above. Thanks

      Delete
  6. This is wonderful!More power to your elbow.Thank you.

    ReplyDelete
    Replies
    1. I'm happy you found the article useful.

      Delete
    2. I have found it so helpful. Infact, it's going to be the bible I will follow to complete my mum's house.

      Delete
  7. Good work. Very detailed and useful information. Thanks

    ReplyDelete
    Replies
    1. You're welcome, AGO. Please do well to share your building experience so we can all benefit.

      Delete
    2. This comment has been removed by the author.

      Delete
  8. Very good work you've done bro,I asked a friend of mine what it would cost to build a 3bedroom flat and he told me 9million,that made me change my plan of starting the construction but I summoned courage and I decided to check online,sincerely your article has really helped me.thanks a lot

    ReplyDelete
    Replies
    1. The cost of building a 3bedroom flat or any other structure depends on factors like the soil type, location, access to materials, finishing, type of roof, etc. Consider using some of the cost-saving tips mentioned in the article.

      We hope you'll share your building experience so that we can all learn.

      Cheers.

      Delete
  9. Great... i must say this is a good one as i also have a land in abuja to build a 3bedroom with penthouse... would like to work with you on this if you have an office in Abuja.

    ReplyDelete
    Replies
    1. I'm an architect I can help with a well detailed Architectural drawing,
      Structural drawing,Electrical drawing,Mechanical drawings here is my number 08058596979

      Delete
    2. This comment has been removed by the author.

      Delete
  10. This is a wise up guide thanks

    ReplyDelete
    Replies
    1. Glad you found the article useful. You're welcome.

      Delete
  11. This is really awesome, I was so amazed and happy reading this, it indeed trow some light to the mystery behind simple house construction. Very useful article!

    ReplyDelete
    Replies
    1. True, constructing a simple home is not as difficult as some people make it seem. Glad you enjoyed the article.

      Delete
    2. I love your article and I think I need professional help in building my bungalow which I have not been able to do anything on my land due to lack of information. Please I would not mind to get your number so I can have a one on one discussion with you over my present predicament in trying to build my bungalow. I am getting discouraged by the day

      Delete
  12. Thanks for this great info,I'm about to fix my lintel n the welder says I will need 85k just for the rods n binding wires,excluding carpentry work which will cost 35k?isn't this too expensive ?
    Cements n granite isn't there including paying labour,but with this information can I do the calculations myself?

    ReplyDelete
    Replies
    1. Yes, you can calculate the cost of constructing the lintel. Find out the type of lintel he intends to construct. Get the entire length of your building, divide that length by 20, and multiply the result by 4. That will give you the number of 20length rods you need for the lintel. That will also determine the amount of binding wires you need.
      As for the other prices, you can beat them down to amounts that you are comfortable with.

      Delete
  13. This is really helpful,thanks to people like you that opens people's eyes to know they can do what they think its impossible, will contact you soon

    ReplyDelete
  14. Your detailed analysis are mind blowing. You have been able to instilled a great dose of confidence in myself and millions of other Nigerians hoping to build homes. Can not thank you enough.

    ReplyDelete
    Replies
    1. Glad you found it useful, Snail Man. You're welcome.

      Delete
  15. I enjoyed every bit of your analysis on building made easy for common man like me. It an eye opener and a form of courage for me to start up something little, not waiting until I get millions in my account. Thanks and God bless you sir .

    ReplyDelete
    Replies
    1. Good morning sir can you please tell if 800000 naira can build a small fence in a 1 plot of land in Lagos is a Dryland thank you

      Delete

  16. Great article, I was thinking of a budget of 8million, now I know I can have a great house with a budget less than that. N6million is OK for a moderate cool house with perimetre fencing I guess. You have not also include interlocking cost on a plot of 100x50 with a 3bedroom on it and cost of a borehole.

    ReplyDelete
    Replies
    1. With ₦8 million you can do your perimeter fence, have a beautiful landscaped compound, and get a submersible pump to pump water from the well you already made.
      Do well to share your building experience with us so that we can all learn.

      Delete

  17. Great article, I was thinking of a budget of 8million, now I know I can have a great house with a budget less than that. N6million is OK for a moderate cool house with perimetre fencing I guess. You have not also include interlocking cost on a plot of 100x50 with a 3bedroom on it and cost of a borehole.

    ReplyDelete
  18. I will like to know the cost of roofing an eight room self-contain. I have personally taken this to the lintel level. Kindly help with your advice. 08065774943

    ReplyDelete
    Replies
    1. I'll suggest you do a slightly slanting flat roof. It's also called a 'lean-to roof' or 'shed roof'. It's very classy and super cheap as it'll reduce the cost of labour as well as the number of woods and other materials needed by over 50%.

      Delete
  19. Its great, believe me it is. nice one.
    I love the way you broke the stages down, its in the best possible way ever.
    I went over and over again looking the fault but there was none.
    I'm a Builder and believe me this is wonderful...!

    ReplyDelete
  20. Hello Barbara,
    please can you give me an idea of what it will cost to build a 4bedroom flat with 9" inches block with one of the rooms attach to it as self contain having a separate door.
    The current price will be appreciated. Also give the cost as you did in your explanation above (foundation, dpc,lintel etc).Number of blocks in each stage.

    Thanks in anticipation

    ReplyDelete
    Replies
    1. Hi, Ago.

      A quantity surveyor will give you the most accurate breakdown for your 4 bedroom flat. Of course, that's after your building plan is ready. But you can check out this post for a clue to what it might cost you.
      https://castleshub.blogspot.com/2018/03/low-cost-four-bedroom-bungalow.html?m=1

      Cheers!

      Delete
  21. Thank U for this article... It's an eye opener, I must confess.

    ReplyDelete
  22. This article is really encouraging. It gave me courage. I observed you did not mention anything about pillar and column. Is there no need for it? Thanks

    ReplyDelete
  23. This is superb. Can you share your contacts with me on bolanlesbamidele@gmail.com

    ReplyDelete
  24. This piece is Really educative. Thanks

    ReplyDelete
  25. I started a building and i feel it is too expensive: foundation to DPC cost abt N4m, decking N4m, parapet N1.2m etc. The building so far is at parapet level at a cost of about N16m. pls is this too expensive? building type: 4 two-bedrooms building. Thanks

    ReplyDelete
    Replies
    1. Wow. This is sooo expensive!!!! We can provide you with quotes for the remaining jobs so that you can compare. Contact us at Shang Engineering. +2347038935532

      Delete
    2. Yes, it is super expensive!!! The amount you've spent so far should build the house from foundation to finishing. N4 million from foundation to DPC? That's simply outrageous!!!

      Delete
  26. Thanks for this wonderful job. God bless you.

    ReplyDelete
  27. This is mind blowing and quite encouraging. Just came across this article now.
    Can we communicate on the email above. .. in the process.
    Thanks.

    ReplyDelete
    Replies
    1. Yes, we can communicate via the email address above.

      Delete
  28. Really like this. Please Can you give a rough estimate of roofing 4bedroom flat with steptile roofing sheet of 10M Height and 300MSQ Size.

    Some pple are quoting between 1.5 to 1.8million for this which I think I quite outrageous amount.

    Thanks.

    TUNJI

    ReplyDelete
    Replies
    1. You should spend about 1.2million total.
      Contact Shang Engineering on +2347038935532

      Delete
    2. Good morning sir I wanted to build a 4 bedroom bungalow I was told the foundation will cost me 1.5 million but I had issues so I could not raise the money for the project I'm worried of losing my land so I was wondering if i can build a good fence for a very good but small fence to secure my land

      Delete
    3. You shouldn't spend up to that, if it's not too late you can contact me on +2348058596979

      Delete
  29. Thank you very much for this concise information. More grace to your efforts!

    ReplyDelete
  30. This really amazed and enlightened me. I believe with this after my graduation as a student I can't be dumped by anyone when it comes to house construction.

    ReplyDelete
    Replies
    1. Glad to have helped. It turns out that you can actually build a beautiful 3 bedroom flat for 20% cheaper than the price of the one above. That's with strict supervision.

      Delete
  31. This is awesome, now i have little idea on how to start.
    Thank you so much

    ReplyDelete
  32. can you update us with the current cost please

    ReplyDelete
  33. Good job my Bros. you have done justice to my heart.
    can't wait to get started ... God bless you

    ReplyDelete
    Replies
    1. You're welcome. You can actually build a beautiful 3 bedroom flat for less than the price of the one above, if you apply strict supervision.

      Delete
  34. May God Bless you For this useful information. Thanks

    ReplyDelete
  35. What a great relief! God bless you.


    ReplyDelete
  36. Good write up. But some of these things are a bit less than reality. I build for a living.

    1. For The woodwork you need 3x4, 2x6, 2x4, 2x3, 2x2 and 1x12. It would cost at least 500k.


    ReplyDelete
    Replies
    1. From experience, I mean 2019 experience, you can roof a 3 bedroom flat for about #350,000 - #500,000. This includes the woods, roofing sheets, ceiling boards, and other accessories. The secret is to use "SHED" roof ("LEAN-TO" roof).

      Delete
    2. Pls can u share pictures what u mean by lean to roof

      Delete
    3. Here's a link: https://www.google.com/search?q=houses+with+skillion+roof&client=ms-android-hmd-rev2&hl=en&prmd=inv&source=lnms&tbm=isch&sa=X&ved=2ahUKEwj8w8mWla_hAhVjUxUIHckiAKgQ_AUoAXoECAkQAQ&biw=360&bih=512

      Delete
  37. In fact you lift up my spirit, I have been so scared of starting anything. This is very educative.

    ReplyDelete
  38. Pls does it cost the same amount to build 2bedroom,is there any slightly difference

    ReplyDelete
    Replies
    1. A friend just finished her 2 bedroom flat for around 4m.

      Delete
  39. Very insightful, thanks for putting this up 👍

    ReplyDelete
  40. Contact us today for your building designs and construction..

    Phone/whatsapp:08144181499

    ReplyDelete
  41. Please which labourer charges 4,000 naira for the trench excavation of a 3bedroom bungalow?
    Please check your analysis very well.
    Thank you.

    ReplyDelete
    Replies
    1. Thanks for your contribution. The 3 bedroom flat described in the post is an actual project and the amounts are also related to the project. I have also updated the price of some materials to reflect current market prices.

      Please, share the price you think is more correct as well as your building experiences so that we can all learn.

      Cheers.

      Delete
  42. As much as I'm glad you're giving hope to prospective home owners, this is probably going to be more detrimental to them than helpful. For one the prices here are overly optimistic and simply unrealistic. Those of us who are presently building know exactly what I'm talking about. I understand these estimates are often used to win the confidence of prospective customers and then when they are already committed financially they realize that there's way more to it than that conveniently modest estimate that was once music to their ears.

    ReplyDelete
    Replies
    1. Yes, the aim of my blog is to demystify building construction and save project owners from thieving project supervisors/engineers and workers alike by sharing actual building experiences and ideas.
      Nigerians who have worked hard to make money and desire to have a house at home are often ripped off by contractors/builders because they can't supervise the project. By sharing building experiences as well as ideas from actual building engineers in the field, I hope to help Nigerians achieve their dream of becoming a homeowner.

      The project I wrote about is an actual 3 bedroom flat and I have updated the prices to meet current market prices. The price of cement from January till now, for instance, has been fluctuating between 2550 naira and 2650 naira from retailers and the price in my post is 2600 naira. So, I don't know what you mean by "overly optimistic and simply unrealistic" prices. And I am sure there's no caucus of those "who are presently building" who now one 'secret' that others don't. Please, share your not "overly optimistic and simply unrealistic" prices so that we can all learn. I am not against you collecting 9m for a project of 6m, just be kind enough to let the owner know that the extra 3m is yours.

      Do well to share your building experiences and every information you think will be helpful with us so that we can all learn.

      FYI, I'm neither a builder nor a contractor.

      Cheers!

      Delete
    2. As you have clearly stated "you are not a builder/ contractor". You simply want to tarnish the image of construction professionals. It might interest you to know that building construction is always peculiar to location and environmental challenges. Thus the solution requirements varies.

      Delete
  43. Thanks very much sir for this information. I want to ask if is possible to write three different names on C of O?

    ReplyDelete
  44. Great , thank for this piece. I have just acquired a piece of land in Ibadan.
    How much do you think will be enough enough to build a 5 bedroom bungalow with penthouse in Ibadan? All room ensuite, 2 bedroom in the penthouse and others downstairs.
    many thanks

    ReplyDelete
    Replies
    1. Contact us today for your building designs and construction..

      Phone/whatsapp: 08058596979

      Delete
  45. You try wella. God bless you


    ReplyDelete
  46. Thanks.
    But building in a swampy area is far far more expensive..cos you need to buy tons of iron rods, woods, and many trips of sand with all the workmanship involved, only for the foundation!!!

    ReplyDelete
    Replies
    1. I would recommend designing your house on stilts. The trick is to work with the landscape and it should save you a ton of money and materials.

      Delete
    2. Please I have a 5 bedroom bungalow with penthouse how much should it cost me as workmanship only to the engineer on site and it will cover setting of blocks, casting of pillars and lintel iron bender carpenter and other expenses to the 3 couch level

      Delete
  47. Contact Precious Itekena Engineering for all your Electrical installations +2349076377738

    ReplyDelete
  48. This helpful thanks for sharing this here

    ReplyDelete
  49. You have done a great job bro, please don't allow bad bells people to discourage you.
    Thanks for enlighten us.

    ReplyDelete
  50. Hello, you v done a great job. In fact I don't know how to thank for this little information you just provided. Thanks so much, pls I need a building proposal for 2/3bedrooms. Thanks

    ReplyDelete
  51. thank you very much and your post is really great but my question is,i just got a plot of land and i have finished molding over 4K blocks and intends to lay the foundation for 4 bedroom bungalow and build it to DPC level and how much do you think it will cost me to build it to DPC level?

    ReplyDelete
  52. Nice job bro, if you need a professional painting company. Deco_master is there for you, just call on us 08066910926

    ReplyDelete
  53. I enjoyed your post and liked it. Please can I have an updated version it in line with current realities. Thanks

    ReplyDelete
  54. I must confess, this article is very helpful. Thank you so much for taking your time to put this up. God bless you real good. I'll follow everything written here and get actual and current cost of the materials needed. Thank you once again.

    ReplyDelete
    Replies
    1. You're welcome. Please, do well to share your experience with us here so that we can learn.

      Delete
  55. Hello, i found this helpful... Can i work with you on a project of 3 bedrooms and one masters... Location delta state agbor

    ReplyDelete
  56. What a great job. Excellent.

    ReplyDelete
  57. Very insightful...thanks for posting this article

    ReplyDelete
  58. Nice work...Please inbox me your contact, we got some work to do

    ReplyDelete
  59. This is great, thank you for this Excellent work

    ReplyDelete
  60. Please I have a 5 bedroom bungalow with penthouse how much should it cost me as workmanship only to the engineer on site and it will cover setting of blocks, casting of pillars and lintel iron bender carpenter and other expenses to the 3 couch level

    ReplyDelete
  61. I will only needs to proviDE all materials

    ReplyDelete
  62. Hello, an amazing Information dude. Thanks for sharing this nice information with us. Building Contractors in Nigeria

    ReplyDelete
  63. Very insightful. Thanks. I learnt from your post that you are an architect. Kindly avail me of your number I need you to help me design the best property on half plot of land in Sangotedo Lagos. I look forward to hearing from you

    ReplyDelete
  64. Really detailed. I do appreciate. Cheers.

    ReplyDelete
  65. Magic Design & Consortium:
    For your detailed drawings and affordable development. Pls call Architect Emmanuel Orji on 07032603585.

    ReplyDelete
  66. Lovely article of you I will have to read more

    ReplyDelete
  67. Nice one but a lot of things needed to be revisited right now..
    For ur drawing s
    Architectural
    Mechanical
    Structural
    Electrical

    Supervision...
    We design and build stable economic house..
    Contact us on
    07034190901

    ReplyDelete
    Replies
    1. yes please can anyone tell me what a 3 bedroom bungalow cost now GOD HELP ME

      Delete
  68. HELLO GET OUT OF FINANCIAL MESS WITH THE HELP OF drbenjaminfinance@gmail.com

    I have been in financial mess for the past months, I’m a single mum with kids to look after. My name is REBECCA MICHAELSON, and am from Ridley Park, Pennsylvania. A couple of weeks ago My friend visited me and along our discussion she told me about DR BENJAMIN OWEN FINANCE of (drbenjaminfinance@gmail.com); that he can help me out of my financial situation, I never believed cause I have spend so much money on different loan lenders who did nothing other than running away with my money. She advised, I gave it a try because she and some of her colleagues were rescued too by this Godsent lender with loans to revive their dying businesses and paying off bills. so I mailed him and explain all about my financial situation and therefore took me through the loan process which was very brief and easy. After that my loan application worth $278,000.00USD was granted, all i did was to follow the processing and be cooperative and today I am a proud business owner sharing the testimony of God-sent Lender. You can as well reach him through the Company WhatsApp +19292227023 Email drbenjaminfinance@gmail.com

    THANK YOU VERY MUCH

    ReplyDelete
  69. Hello.

    Thanks for the update. Please can you edit the prices, because prices of things have changed.

    Thanks

    ReplyDelete
  70. Nice article! Im looking forward to post more about bungalow house design philippines I need ideas to design my rest house in Baguio. thanks!

    ReplyDelete
  71. As you plan on building, you need movies to help you relax. Download Latest Hollywood, Bollywood, Nollywood, Chinese, Korean, Japanese, Animation Movies and More. In Mp4 and HD Best Quality Formats here at Terrenetv

    ReplyDelete
  72. How can someone contact you for a building plan such as this one?

    ReplyDelete
    Replies
    1. Architect Aderemi10 May 2022 at 19:53

      Kindly give a us a call or WhatsApp text to this number
      +2348058596979

      Delete
  73. How can I get the current updated version of this?

    ReplyDelete

Post a Comment

Popular posts from this blog

How to Calculate Quantities of Cement, Sand, Granite for Concrete Foundation from Building Plan

To begin this calculation you should know the concrete strength class you want to achieve and in turn the concrete mix you are using. The right concrete mix depends on the cement grade that you are using. The minimum concrete strength class recommended for the construction of the load-bearing building structural members is concrete strength class 20/25. In the Nigerian open market, the two cement grades/strength classes that are available and which are used for building construction are cement grade 32.5 and cement grade 42.5. To produce concrete with strength class 20/25 which is the minimum concrete strength class recommended for the construction of the load-bearing building structural members, you should use one of the following concrete mix ratios/cement grade pairs: A mix-ratio of 1:1.5:3 using Portland-limestone cement grade 32.5 to produce concrete strength Class 20/25 A mix-ratio of 1:2:4 using Portland-limestone cement grade 42.5 to produce concrete strength Class 2

What can you Build on a Half Plot of Land? (50ft x 50ft), (60ft x 60ft) or (30ft x 120ft)

Many people dismiss the idea of buying a half plot of land because it seems too small to do anything serious with. Perhaps you are thing what can you really do with a half plot of land? how many bedrooms can fit in a half plot of land? can I build a 3-bedroom or 4-bedroom flat on a half plot? can a half plot contain a duplex?... Photo by Francesca Tosolini on Unsplash The fact is that you can do a lot with a half plot, be it (50ft x 50ft), (60ft x 60ft) or (30ft x 120ft). Below are a few ideas of what you can build on a half-plot land to inspire you. Residential Buildings on a Half Plot of Land (50ft x 50ft), (60ft x 60ft) or (30ft x 120ft) A 2-bedroom flat with parking space for 3 cars A 3-bedroom flat with parking space for 3 cars A 4-bedroom flat with parking space for 2 cars 2 units of mini flats (that is one bedroom flat) plus a unit of self-contain room with parking space for 3 cars A bungalow comprising 2 units of 2-bedroom with parking space for 2 cars 4 units of mini-flats A

How to Calculate Number of Blocks from Floor Plan

About to start your construction project but wondering what your budget for materials should be? How many blocks can build a single room or 4-bedroom bungalow or what number of blocks will fence your plot of land? It can be quite a headache finding straight answers to such questions. And available estimates may not fit your particular building design. However, knowing how many blocks your project requires can help you with planning and budgeting. Instead of working based on guesses, you can pay a quantity surveyor to do the material estimates. Nevertheless, you can calculate the actual blocks to complete your 3-bedroom bungalow by yourself. This article will show you how to get an accurate estimate of blocks you need to complete a building project using the floor plan. All you need is your building plan, a calculator, a pen, paper, and your favourite drink. Let us begin. We will be using the sample 2-bedroom floor plan below. Note: The width of the common sandcrete blocks are 9&q